This Quality Plan sets the project plans and expectations for overall
project quality, tools, processes and plans. This includes early
release programs (like alpha- and beta-sites).
Must |
-
Maintain code at its current quality level
-
Meet division blah's functionality needs
|
Want |
-
Improve code quality in the blah module
-
Add additional test coverage
|
Not |
-
Get to 100% branch coverage
-
Remove all defects
|
The FLURPS (functionality, localizability, usability, reliability, performance
and supportability) model is the basis for this quality plan. These
various FLURPS aspects need to be balanced.
Quality Aspect
|
Importance
|
Comments
|
Functionality |
Medium |
blah blah |
Localizability |
Low |
The system includes localization facilities for divisional use, but
the base system doesn't need to be localized. |
Usability |
High |
blah |
Reliability |
High |
blah |
Performance |
Medium |
The intent is to have good performance, but in the context of the use
of the system, performance is not a huge driving issue. |
Supportability |
Medium |
blah |
The specific artifacts and/or components that will be tested are:
-
Installation application
-
Readme file
-
FooBar application
-
BarFoo ActiveX/COM component
-
Help files
-
Xxyyz printed docutment
-
Uninstall application
The features that will be tested are:
Artifact
|
Features to be tested
|
FooBar application |
|
BarFoo ActiveX component |
-
integration with Visual Basic
-
yy
|
Help files |
-
speelling
-
that there grummar thing
|
Xxyyz printed docutment |
|
The specific project quality metrics are:
Quality Metric
|
Minimum
|
Desired
|
Achieved
|
Branch coverage |
75% |
90% |
to be determined |
Critical defects |
none |
none |
to be determined |
Serious defects |
none |
none |
to be determined |
Regression test suite |
fully run |
fully run |
to be determined |
Inspection on blah |
blah |
blah |
blah |
Platforms tested |
blah |
blah |
blah |
OS's tested |
blah |
blah |
blah |
Tool
|
Source
|
Comments
|
Regression test harness |
internal |
|
DDTS |
commercial |
blah |
BFA tool |
internal HP |
blah |
Processes and
Responsibilities: |
Quality / Testing Task
|
Owner
|
Comments
|
Completed
|
Branch flow coverage |
X |
|
|
Regression test suite |
Y |
|
|
Task
|
by
|
Owner
|
Status
|
Preliminary Quality plan written |
Initiation |
Project Manager |
|
Preliminary Quality plan updated |
Requirements Complete |
X |
|
Final Quality plan |
Functionality Complete |
X |
|
Regression tests run |
Release |
X |
|
Branch flow analysis run |
Release |
X |
|
Alpha and Beta
Release Plans: |
There will be no formal early release programs.
|